GT Control SW – Ibri & Sohar III – Oman (GT26, Ansaldo Energia)

Monday, February 10, 2020 @ 04:02 PM
Project Name: Ibri 1510 MW CCPP  and Sohar III 1710 MW CCPP, Sultanate of Oman
Client: Ansaldo Energia Switzerland AG
Scope: Process control system engineering, simulator testing and site support for the eight GT26 Gas Turbine for the project Ibri and Sohar (Alspa)
Start / Duration:

 

Ferbuary 2017 / 14 months

The Ibri and Sohar III CCPP IPP projects have been developed by the sponsor consortium of Mitsui & Co. Ltd., ACWA – International Company for Water and Power Projects and DIDIC – Dhofar International Development and Investment Holding Company, following a simultaneous award of the two projects to the development consortium by Oman Power and Water Procurement Company SAOC of Oman. The two power stations operate and supply power under a PPA to the grid in the Sultanate of Oman.

Ansaldo Energia supplied the main power train equipment components, including for each power plant, four of Ansaldo Energia’s high-efficiency advanced GT26 class gas turbines (formerly Alstom), four heat recovery steam generators (HRSGs), two steam turbines and six turbo generators to SEPCOIII Electric Power Construction Cooperation of China (SEPCOIII), who was responsible for engineering, procurement and construction (EPC) on a turnkey basis.